Quality · Nov 2026 · 5 min read · By Laboratory House
Accreditation is easier when quality work starts on day one. This roadmap is for laboratories that are new to molecular testing and want a clear sequence of steps. It is a general guide; always check the current requirements with the accreditation body.
Step 1: Gap assessment
Compare your current practice with the requirements of ISO 15189 and your accreditor’s scope documents. The output is a list of gaps ranked by effort and risk.
Step 2: Define scope
Decide which tests, instruments and sites you want in scope. A smaller initial scope is usually faster than trying to cover everything.
Step 3: Build the documents
- Quality manual and policies
- SOPs for pre-examination, examination and post-examination processes
- Equipment, calibration and maintenance records
- Safety, waste and contamination control procedures
- Competency and training records
Step 4: Validate or verify methods
Collect and analyse evidence that each method performs as intended. Commercial methods are usually verified against the manufacturer’s claims; in-house or modified methods need full validation. See our validation service.
Step 5: Join EQA and run internal QC
Enrol in suitable external quality assessment schemes and run internal quality control consistently, with records that show how deviations are handled.
Step 6: Mock audit and corrective actions
A mock audit exposes problems while there is still time to fix them. Track every finding to closure before the real assessment.
Our team supports each step, from lab design to training. Contact us to discuss your timeline.
For healthcare professionals. Educational content only; not a substitute for clinical judgement. Product regulatory status is as per the principal’s approvals.
